| 117 of these Clayton/Beyer Peacock locomotives were ordered in two batches (88 & 29). The first locomotivers were delivered in the autumn of 1962, the last in the spring of 1965. Problems with the Power units in the first batch led to withdrawl begining in the late 60's. |
|
Class 17 at Pelaw Cl17aD85xx.jpg |
Class 17 on a small freight Cl17bD85xx.jpg |
| | |